To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window.

To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Control \ Schedule with the associated dates (current, baseline(s)) displayed in the Gantt window. As of today only one 3D window is displayed in Synchro Control \ Schedule.

Purpose being, for example, to animate in one 3D Window the Baseline Time Schedule, and in another 3D Window, the Current Time Schedule to communicate main deviations to the Project stakeholders.

The possibility offered by Synchro to visually compare different revisions of the Time Schedule is really a plus, it will be a pity not to have this possibility in Synchro Control \ Schedule.

This enhancement request is internally referred as 4DMS-01.